We inspect every single piece of bearing by ourselves before supply. we are self-confident to provide our buyers adaptable and diversified companies. In 2000, EPG took the direct in getting ISO14001 setting administration certification and thereafter passed the inspection of clean creation and recycling financial system, successful the title of “Zhejiang Green Company”. Notice:
The requirements can be designed according to the customer’s requirements!
Software:
Electric Drill, ScrewEPTr, Scanners, Printers, Vending EPT, Window Curtain, Espresso EPT, Electric Lock, and so on.
Parameter:
Quantity of stages | three | 4 | 5 |
Equipment ratio i | ten | fifty | 210 |
a hundred | 250 | ||
one hundred fifty | 298 | ||
Length of EPT L(mm) | nine. |
Specification:
Design | VOLTAGE V |
NO LOAD | AT MAXiHu (West Lake) Dis.MUM Effectiveness | STALL | |||||
Speed rpm |
Present mA |
Speed rpm |
TORQUE kg.cm |
Existing mA |
OUTPUT mW |
TORQUE Kg.cm |
Existing mA |
||
D122-003210 | three. | 35 | 35 | 27 | .twenty five | 80 | 70 | one.two | 250 |
D122-001100 | three. | 110 | 50 | 91 | .14 | 150 | a hundred thirty | 1. | 650 |
D122-57150 | 2.4 | three hundred | sixty | 240 | .07 | 250 | 170 | .four | one thousand |
D122-05718 | 3. | 50 | 60 | 40 | .4 | 250 | one hundred seventy | two.two | 1000 |
About Us:
We EPTized in studying, deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ing, and servicing electrical motors, EPT, and higher precision EPTs with the tiny module. Right after a long time of deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment, we have an impartial item layout and R ampD crew, support team, and a specialist good quality management staff. To understand our provider notion much better, provide large-good quality merchandise and exceptional support, we have been committed to the main capacity and education. We have a EPT manufacturing unit in NanEPTg, which creates substantial precision tiny mould EPTs, EPT shaft, EPT, and planetary EPT assembling.
Perform-circulation:
Certificate:
RoHS, CE, and much more…
Provider:
ODM amp OEM
EPT design and deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment
Bundle ampShip:
Carton, pallet, or what you want
The delivery time is about thirty-45 times.
Customer’s Browsing:
FAQ:
1. Can you custom made EPT?
Indeed.
2. DO you provide the sample?
Sure.
three. Do you give technical assist?
Sure
four. Do you have a manufacturing unit?
Indeed, we are a professional manufacturer.
5. Can I appear to your company to pay a visit to?
Sure